I don't know if this is a bug in my implementation, or if I'm missing something.
Suppose I want to move a clip to the right, to insert a title in front of it, or split a clip in two and move the 2nd half to the right 10 seconds to add a title before it. HOW?? Usually, the duration of the timeline is limited to the length of my movie, leaving no room to drag the last clip to the right. However, even if I add a title or audio clip to the end (to "lengthen" the timeline), I'm still unable to move anything to the right to make room for my title. It's like AVSVE decides where the clip shall go and by God, that's where it will stay.
Every other video editor I've ever used allows me to grab and move clips left and right (if there's empty space on either side). Doesn't this one?
Thanks.